Aerospace RFQs · On-premise
- Automatic BOM extraction
- AI-predicted machining times
- End-to-end quoting workflow
Installed on-site — no data ever leaves your walls. Full sovereignty.
| RFQ code | Customer | Status | Margin | Deadline |
|---|---|---|---|---|
| RFQ-20260512-022 | OEM customer | Submitted | + 31.8% | D + 9 |
| RFQ-20260415-019 | Light defense program | Needs review | − 3.2% | D − 2 |
| RFQ-20260408-011 | Tier 2 subcontractor | Won | + 12.1% | D + 12 |
Step 4 of 4 · Review before publishing
D2A4567-2001
Ti-6Al-4V · cast cert 3.1
F1B8902-1100
AA2024-T351 · 12.7 mm thick
Extract — the machine reads what you used to read by hand
02 · Extract
Urgent new RFQ
124 parts. 450 documents. What used to take your team days to comb through, MPX ENGINE does in minutes.
Smart customer recognition
One native extractor per customer — trained on their own RFQ package, codes and layout. We build yours.
Bills of materials, rebuilt automatically
Multi-level BOM, smart document assignment.
It's all there. No data left behind.
Revision, class, material, surface treatment and special processes — aligned with the customer's own codes.
Detailed analysis — MPX-A350-FRAME-001
Native Safran Nacelles extractor- Revision
- B
- Material
- 7175
- Material spec
- ABS5064
- Classification
- Class 1
- Chromic acid anodizing (CAA / EN 2101)Surface treatment
- Tempering heat treatment (AMS 2759)Heat treatment
- Penetrant inspection level 2 (ASTM E1417 / EN 4179)Special process
- Laser marking P/N + S/N (AS9132)Traceability
Focus your effort where it matters.
Your estimator stops re-keying: they check and decide. Hours of data entry become a few minutes of review.
Engineering — your know-how, structured at last
03 · Engineering
Your know-how, structured at last.
The tedious work to the machine. The judgment to your experts.
Part MPX-DEMO-FRM-204
Identity
MPX-DEMO-FRM-204
Structural link fitting
Material
Catalog OKTi-6Al-4V
Stock material
Adjusted blankProcess plan
| Phase | Activity | Machine | Setup (h) | Cycle time (h) | Prog ($) | Tooling ($) | Other ($) | Lead time (d) | Subcontracting |
|---|---|---|---|---|---|---|---|---|---|
| 10 | 5-axis milling | 5-axis center | 2.5 | 0.8 | $680 | $950 | — | 12 | In-house |
| 20 | Secondary milling | 3-axis center | 1.0 | 0.2 | $240 | $320 | — | 8 | In-house |
| 30 | Chromic acid anodizing | — | 0 | 0 | — | — | — | 5 | Subcontracted |
| 40 | Dimensional inspection | CMM | 0.5 | 0.4 | — | — | — | 0 | In-house |
Predict — machining time, from a single STEP
04 · Predict
Machining time. From a single STEP.
A machining-time prediction in seconds. A model trained on your own history, so the numbers hold up.
MPX-DEMO-FRM-204.step
Structural link fitting · Ti-6Al-4V · Class 1
Estimated machining time
excluding setup and subcontracting
Model confidence
on this part
Same part — 3D model analyzed
Part analysis
- Material to remove
- ≈ 86% of the blank
- Machined volume
- ≈ 1,360 cm³ of chips
- Part envelope
- 241 × 84 × 80 mm
- Shape complexity
- Medium, 5-axis
- Drilling / pockets
- Several open pockets, no drilling
Parts close to your history
MPX-DEMO-FRM-188
Link fitting
Similarity 96%54 minMPX-DEMO-FRM-231
Structural fitting
Similarity 93%61 minMPX-DEMO-BRK-097
Machined bracket
Similarity 89%52 minMPX-DEMO-FTG-145
Clevis fitting
Similarity 85%66 min
Purchasing — your supplier RFQs, already prepared
05 · Purchasing
Your supplier RFQs, already prepared.
Material, surface treatment, hardware: MPX builds the supplier RFQs for you — quantities, specifications and grouping. Purchase history in one click. Send them out in minutes instead of two days.
Three supplier RFQs, generated from the part
The blank to cut, quantities and stock sizing included
≈ 4,326 kg of Ti across the program
Supplier quotes received
- Supplier ATitanium bar / plate distributor$48/kg200 kg8 wksSelected
- Supplier BTitanium bar / plate distributor$52/kg100 kg6 wksReceived
- Supplier CApproved titanium foundry / forge$46/kg500 kg12 wksReceived
Already quoted elsewhere
Your reference prices
Ti-6Al-4V — comparable references
- Ti-6Al-4V · plate$47/kg7 wks200 kgSupplier A
- Ti-6Al-4V · bar$51/kg6 wks100 kgSupplier B
- Ti-6Al-4V · plate$49/kg9 wks300 kgSupplier C
Chromic acid anodizing (EN 2101)
- Chromic acid anodizing · EN 2101$13/pc5 dbatch 25Treater A
- Chromic acid anodizing · EN 2101$15/pc7 dbatch 50Treater B
Sales — your offer, assembled for you
06 · Sales
Your offer, ready to turn into an order
Engineering and purchasing work brought together: manage your margins and fine-tune your offer for a fast submission to your customers.
Everything upstream flows into the offer
- Engineering costassembledProcess plan time + predicted machining timeProcess plan · Predict
- Purchasing costassembledSelected supplier quotes — material, anodizing, fastenersPurchasing
- Additional costsassembledFreight, customs, packagingLogistics
Price per quantity tier — sliding scale
- 1$1,480$1,480/pc
- 5$5,600$1,120/pc
- 10proposed tier$9,800$980/pc
- 25$21,750$870/pc
- 50$41,000$820/pc
Illustrative prices — your real prices stay with you, on your server.
Margin — set by you
5 margin levels
The price per tier follows your decision.
Versioned offer, ready to send
Every revision is tracked
- Version
- v2
- Validity
- Valid for 30 days
- Notes
- Margin revision — tiers adjusted
History
- v1
- v2
The quote that took two days is ready. In hours.
Going further
What's next
You've seen what we do.
Here's how we deliver it.
The exact scope and how we install it on your premises. Two pages, straight to the point.
A specific question? Let's talk.
Numbers in hand: what your quoting costs you today, and how much of it you can win back.
